ContactTel:+361 293 4459 AFS:LHBPYNYN Email:pubsdo@hungarocontrol.hu HungaroControl Pte. Ltd. Co. | AIP Supplement for HUNGARY![]() HUNGAROCONTROL | AIP SUP 005/2024 Effective from 10 DEC 2024 to 30 APR 2025 Published on 10 DEC 2024 |
The objective of this AIP-SUP to inform the relevant personnel about the penetration of obstacle limitations surfaces of LHBP airport by cranes erected next to the RWY 13L/31R.
The construction of Parcel Logistics Centre next to the airport has been started.
During the construction period a crane garden is activated. The number of cranes are between 1 and 4 depends on the status of construction.
The crane garden is active:
From: 06:00 10th of December 2024
To: 18:00 30th of April 2025
Operational period: H24
The coordinates of the centre position of the crane garden is: 47°26’21.28”N 019°17’16.08”E
The radius of the crane garden is: 270 m from the centre position.
Top elevation of the highest crane is: 183 m AMSL.
Due to height of cranes the inner horizontal surface of the airport obstacle limitations surfaces are penetrated!
All cranes are marked by red and white strips and lighted by low intensity red obstacle lights according to ICAO ANNEX 14.
In case of the lights are inoperative or other relevant information please contact the airside management of Budapest Airport Pte. Ltd. using the following email addresses:
Email:airside.bud@bud.hu